最新欧美国产亚洲一区二区_亚洲日韩中文字幕播放一区_日韩一级欧美一级在线观看_亚洲AV成人无码网站大全唐人_青青草AV在免费线观看久_亚洲精品午夜寂寞爆乳影院_日日狠狠久久偷偷色浪潮av_日韩黄色视频在线_呦女亚洲一区精品_大伊香蕉精品一区在线

Shanghai Cuckoo Automatic&Science Co., Ltd.
中文版 English Feedback
Tel:021-55152032
The latest
Contact us
  • tel:021-55152032
  • Fax:021-55152036
  • E-mail:shcuckoo@126.com
  • Address:Room 328, Building 2, No. 6 Luanchuan Road, Baoshan District, Shanghai
What are the requirements for the installation of electromag

Electromagnetic flow meter is a kind of instrument which can measure the flow of a conducting fluid by the electric potential of the electric potential when the electric field is applied to the magnetic field. Electromagnetic flowmeter is widely used in the sewage, fluorine chemical, production water, water industry, medicine, steel, etc..

Jiangsu ante U.S. Automation Instrumentation Co., Ltd. senior installation personnel said as a kind of high precision electronic instrument, electromagnetic flowmeter for environmental requirements are also higher, in the installation of the electromagnetic flowmeter, be sure to pay attention to the following matters:

1, try to avoid the ferromagnetic objects and devices that have a strong electromagnetic field, in order to avoid the influence of magnetic field sensor of magnetic field and flow signals.

2, should try to install in ventilated and dry place, avoid sunlight and rain, the environmental temperature should be at - 20 to + 60 DEG C, relative humidity is less than 85%, as far as possible to avoid direct sunlight.

3, there should be ample space around the flow meter, easy to detect and repair.

4, choose the place of small vibration.

5, as far as possible to avoid the surrounding environment has a high concentration of corrosive gas.


Top